index
:
gsoc2013-evolution
archive-integration
archive-integration-review
master
Google Summer of Code 2013 - GNOME - Archive Integration workspace
LAN-TW
about
summary
refs
log
tree
commit
diff
stats
log msg
author
committer
range
path:
root
/
calendar
/
gui
/
migration.c
Commit message (
Expand
)
Author
Age
Files
Lines
*
no need to explicitly add the contacts group, the create function does
JP Rosevear
2004-03-27
1
-7
/
+0
*
make sure we always sync the source list and just do it once; unref the
JP Rosevear
2004-03-27
1
-6
/
+13
*
ensure that only one Personal calendar/task list gets created when moving
JP Rosevear
2004-03-24
1
-9
/
+15
*
fix float type pane position keys (we migrated these improperly in the
JP Rosevear
2004-02-25
1
-0
/
+25
*
rename from CONTACT_BASE_URI, and change to contacts:// to match e-d-s.
Chris Toshok
2004-02-13
1
-3
/
+3
*
don't set the group to be read only until after the source is added.
JP Rosevear
2004-01-30
1
-2
/
+3
*
migrate to a specific source (migrate_ical_folder): create a new source
JP Rosevear
2004-01-29
1
-109
/
+165
*
add the source to the group so it actually shows up
JP Rosevear
2004-01-27
1
-4
/
+7
*
get the source name with out using freed memory (migrate_tasks): ditto
JP Rosevear
2004-01-27
1
-2
/
+2
*
Fixes #53338
Rodrigo Moya
2004-01-27
1
-0
/
+3
*
display a progress dialog (dialog_close): destroy it
JP Rosevear
2004-01-25
1
-70
/
+257
*
remove useless e_mkdir_hier call.
JP Rosevear
2004-01-23
1
-7
/
+0
*
update protos
JP Rosevear
2004-01-16
1
-31
/
+330
*
added missing headers.
Rodrigo Moya
2004-01-11
1
-1
/
+2
*
fix typo
JP Rosevear
2003-11-05
1
-8
/
+1
*
add a unimplemented warning so we at least avoid relocation errors.
Larry Ewing
2003-11-05
1
-0
/
+8
*
added more menu items. (delete_calendar_cb): callbacks for new popup menu
Rodrigo Moya
2003-11-04
1
-5
/
+28
*
Merge new-ui-branch to the trunk.
Ettore Perazzoli
2003-10-22
1
-0
/
+126