aboutsummaryrefslogtreecommitdiffstats
path: root/calendar/gui/e-meeting-edit.c
Commit message (Expand)AuthorAgeFilesLines
* A very, long, very tedious IDL API rename and re-scoping;Michael Meeks2000-11-111-10/+10
* fixed a bug that would make the calendar segfault if the meeting editorJesse Pavel2000-11-101-6/+8
* *gui/e-itip-control.c, gui/e-itip-control.glade: changed to GUI toJesse Pavel2000-11-071-22/+46
* added some checks for the type of an incoming iCal component beforeJesse Pavel2000-11-071-1/+1
* fixed problems in which I allocated CORBAJesse Pavel2000-10-281-0/+2
* Small fixes.Jesse Pavel2000-10-271-22/+53
* removed the Evolution-Composer generated files, due to a tip on how we doJesse Pavel2000-10-261-2/+2
* Removed generated files.Jesse Pavel2000-10-261-2/+4
* added this from the composer IDL sourcesJesse Pavel2000-10-261-6/+75
* I've added code to interact with the mailer's CORBA interfaces, thoughJesse Pavel2000-10-251-15/+116
* added more (working) integration with theJesse Pavel2000-10-211-31/+14
* added more (unworking) integration with theJesse Pavel2000-10-211-1/+63
* *** empty log message ***Jesse Pavel2000-10-201-3/+87
* *** empty log message ***Jesse Pavel2000-10-111-51/+5
* *** empty log message ***Jesse Pavel2000-10-041-125/+387
* *** empty log message ***Jesse Pavel2000-10-031-90/+280
* *** empty log message ***Jesse Pavel2000-09-281-0/+257