| Commit message (Collapse) | Author | Age | Files | Lines |
|
|
|
|
|
|
|
|
| |
2000-09-08 JP Rosevear <jpr@helixcode.com>
* conduits/calendar/calendar-conduit.c (transmit): Use
icaltime_as_timet
svn path=/trunk/; revision=5269
|
|
|
|
|
|
|
|
|
|
| |
2000-09-08 JP Rosevear <jpr@helixcode.com>
* conduits/calendar/Makefile.am: Tidy
* conduits/todo/Makefile.am: Tidy
svn path=/trunk/; revision=5263
|
|
|
|
| |
svn path=/trunk/; revision=5183
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
2000-09-02 Christopher James Lahey <clahey@helixcode.com>
* configure.in: Added calendar/conduits/Makefile,
calendar/conduits/calendar/Makefile and
calendar/conduits/todo/Makefile to the list of makefiles to
output.
From calendar/ChangeLog:
2000-09-02 Christopher James Lahey <clahey@helixcode.com>
* conduits/calendar/calendar-conduit.c,
conduits/todo/todo-conduit.c, gui/e-week-view.c, gui/gnome-cal.c:
Fixed some warnings.
From mail/ChangeLog:
2000-09-01 Christopher James Lahey <clahey@helixcode.com>
* folder-browser.c: Removed a warning.
svn path=/trunk/; revision=5179
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
2000-09-01 JP Rosevear <jpr@helixcode.com>
* conduits/todo/todo-conduit.c: Update for new libical.
Conduits should atleast compile again.
* conduits/calendar/calendar-conduit.c: ditto
* Makefile.am: Build the conduits only when they've been
enabled.
svn path=/trunk/; revision=5165
|
|
|
|
| |
svn path=/trunk/; revision=5099
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
* cal-util/cal-component.c (cal_component_get_pilot_id):
(cal_component_set_pilot_id): stubs for pilot id accessors
(cal_component_get_pilot_status):
(cal_component_set_pilot_status): stubs for pilot status accessors
* conduits/calendar/calendar-conduit.c (transmit): start to
convert to cal-component interface
* conduits/todo/todo-conduit.c (transmit): same
svn path=/trunk/; revision=4767
|
|
|
|
|
|
|
|
|
| |
* conduits/todo/todo-conduit.c (conduit_get_gpilot_conduit): if
oaf isn't initialized by the time the conduit starts, start it
up. we do this because we need to start wombat with oaf, and
gpilotd doesn't currently start oaf.
svn path=/trunk/; revision=4539
|
|
|
|
| |
svn path=/trunk/; revision=4501
|
|
|
|
| |
svn path=/trunk/; revision=4227
|
|
|
|
|
|
|
|
|
|
|
| |
* conduits/todo/todo-conduit.c: conduit based on the calendar conduit.
this conduit syncs a pilot's ToDoDB database to wombat's list of "todo"
events.
* gui/gncal-todo.c (simple_todo_editor): set todo's priority control
based on value from ical object during edit.
svn path=/trunk/; revision=4156
|
|
|
|
| |
svn path=/trunk/; revision=4130
|
|
|
|
| |
svn path=/trunk/; revision=3147
|
|
|
|
| |
svn path=/trunk/; revision=2489
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
* Makefile.am: now it doesn't build todo conduit
anymore. Since the conduit is just a skeleton, no need to
build and install it.
* calendar-conduit-control-applet.c: revamped for all the
changes in calendar-conduit.h. Also fixed the pilotId bug that
all conduit capplets had.
* calendar-conduit-control-applet.desktop: renamed to
GnomeCalendar.
* calendar-conduit.h: Fixed namespace pollution, appended GCal
to structures, gcalconduit to methods. Introduced the
GCalConduitContext.
* calendar-conduit.c: No more global variables, all is contained
in a GCalConduitContext variable, that all the signals are
passed as user data.
svn path=/trunk/; revision=1338
|
|
|
|
|
|
|
|
|
|
| |
* *conduit*[ch]: checks return values from gpilotd_init/connect.
* calender.c (vcalendar_create_from_calendar): removed a set
of cleanVObject cleanStrTbl, since the freed memory that the
function returned.
svn path=/trunk/; revision=1319
|
|
|
|
|
|
|
|
|
| |
* calendar-conduit.c: better merge of summary/description
when doing ical_from_remote (update_record), also handles
import from gnomecal to pilot better, and on both ways, repeat
events are much better now.
svn path=/trunk/; revision=1253
|
|
|
|
| |
svn path=/trunk/; revision=1217
|
|
* configure.in: uses GNOME_PILOT_CHECK
* gncal/GnomeCal.idl: added a get_objects() call,
which returns all the objects in the calendar.
* gncal/Makefile.am: added two conduits with
control-applets. Compiled only if configure sets
HAVE_GNOME_PILOT
* gncal/calender-conduit.[ch]: began implementing conduit.
* gncal/todo-conduit.[ch]: begin implementing conduit.
* gncal/corba-cal.c: implemented the get_objects() call.
svn path=/trunk/; revision=1216
|