aboutsummaryrefslogtreecommitdiffstats
path: root/calendar/gui/e-day-view-top-item.c
diff options
context:
space:
mode:
Diffstat (limited to 'calendar/gui/e-day-view-top-item.c')
-rw-r--r--calendar/gui/e-day-view-top-item.c13
1 files changed, 3 insertions, 10 deletions
diff --git a/calendar/gui/e-day-view-top-item.c b/calendar/gui/e-day-view-top-item.c
index dd497e0f7b..51af20bbea 100644
--- a/calendar/gui/e-day-view-top-item.c
+++ b/calendar/gui/e-day-view-top-item.c
@@ -34,6 +34,7 @@
#include <libecal/e-cal-time-util.h>
#include <libedataserver/e-data-server-util.h>
#include <libedataserver/e-categories.h>
+#include "calendar-config.h"
#include "e-calendar-view.h"
#include "e-day-view-top-item.h"
@@ -363,7 +364,6 @@ e_day_view_top_item_draw_long_event (EDayViewTopItem *dvtitem,
{
EDayView *day_view;
EDayViewEvent *event;
- GConfClient *gconf_client;
GtkStyle *style;
GdkGC *gc, *fg_gc;
gint start_day, end_day;
@@ -394,15 +394,8 @@ e_day_view_top_item_draw_long_event (EDayViewTopItem *dvtitem,
cr = gdk_cairo_create (drawable);
- gconf_client = gconf_client_get_default ();
- alpha = gconf_client_get_float (gconf_client,
- "/apps/evolution/calendar/display/events_transparency",
- NULL);
-
- gradient = gconf_client_get_bool (gconf_client,
- "/apps/evolution/calendar/display/events_gradient",
- NULL);
- g_object_unref (gconf_client);
+ gradient = calendar_config_get_display_events_gradient ();
+ alpha = calendar_config_get_display_events_alpha ();
/* If the event is currently being dragged, don't draw it. It will
be drawn in the special drag items. */