aboutsummaryrefslogtreecommitdiffstats
path: root/calendar/gui/main.c
diff options
context:
space:
mode:
authorDan Winship <danw@src.gnome.org>2004-05-12 03:29:04 +0800
committerDan Winship <danw@src.gnome.org>2004-05-12 03:29:04 +0800
commit1b15216f5e285a231bcf5c7165be88607642c259 (patch)
treebbaf70b91a5f8ea5293bf870fe82b19d16971231 /calendar/gui/main.c
parent7f8c30cebcdfd7f63674be90cab467bd6a7495d7 (diff)
downloadgsoc2013-evolution-1b15216f5e285a231bcf5c7165be88607642c259.tar
gsoc2013-evolution-1b15216f5e285a231bcf5c7165be88607642c259.tar.gz
gsoc2013-evolution-1b15216f5e285a231bcf5c7165be88607642c259.tar.bz2
gsoc2013-evolution-1b15216f5e285a231bcf5c7165be88607642c259.tar.lz
gsoc2013-evolution-1b15216f5e285a231bcf5c7165be88607642c259.tar.xz
gsoc2013-evolution-1b15216f5e285a231bcf5c7165be88607642c259.tar.zst
gsoc2013-evolution-1b15216f5e285a231bcf5c7165be88607642c259.zip
Remove the calendar and task list controls
* gui/GNOME_Evolution_Calendar.server.in.in: Remove the calendar and task list controls * gui/main.c (factory): Remove support for the calendar and task list controls * gui/control-factory.c: Remove the property-bag stuff * gui/tasks-control.c: Likewise svn path=/trunk/; revision=25857
Diffstat (limited to 'calendar/gui/main.c')
-rw-r--r--calendar/gui/main.c10
1 files changed, 2 insertions, 8 deletions
diff --git a/calendar/gui/main.c b/calendar/gui/main.c
index 80077d49a7..ecfa80bb5a 100644
--- a/calendar/gui/main.c
+++ b/calendar/gui/main.c
@@ -51,9 +51,7 @@
#define FACTORY_ID "OAFIID:GNOME_Evolution_Calendar_Factory:" BASE_VERSION
#define CALENDAR_COMPONENT_ID "OAFIID:GNOME_Evolution_Calendar_Component:" BASE_VERSION
-#define CALENDAR_CONTROL_ID "OAFIID:GNOME_Evolution_Calendar_Control:" BASE_VERSION
#define TASKS_COMPONENT_ID "OAFIID:GNOME_Evolution_Tasks_Component:" BASE_VERSION
-#define TASKS_CONTROL_ID "OAFIID:GNOME_Evolution_Tasks_Control:" BASE_VERSION
#define ITIP_CONTROL_ID "OAFIID:GNOME_Evolution_Calendar_iTip_Control:" BASE_VERSION
#define CONFIG_CONTROL_ID "OAFIID:GNOME_Evolution_Calendar_ConfigControl:" BASE_VERSION
#define COMP_EDITOR_FACTORY_ID "OAFIID:GNOME_Evolution_Calendar_CompEditorFactory:" BASE_VERSION
@@ -162,15 +160,11 @@ factory (BonoboGenericFactory *factory,
BonoboObject *object = BONOBO_OBJECT (calendar_component_peek ());
bonobo_object_ref (object);
return object;
- } else if (strcmp (component_id, CALENDAR_CONTROL_ID) == 0)
- return BONOBO_OBJECT (control_factory_new_control ());
- else if (strcmp (component_id, TASKS_COMPONENT_ID) == 0) {
+ } else if (strcmp (component_id, TASKS_COMPONENT_ID) == 0) {
BonoboObject *object = BONOBO_OBJECT (tasks_component_peek ());
bonobo_object_ref (object);
return object;
- } else if (strcmp (component_id, TASKS_CONTROL_ID) == 0)
- return BONOBO_OBJECT (tasks_control_new ());
- else if (strcmp (component_id, ITIP_CONTROL_ID) == 0)
+ } else if (strcmp (component_id, ITIP_CONTROL_ID) == 0)
return BONOBO_OBJECT (itip_bonobo_control_new ());
else if (strcmp (component_id, CONFIG_CONTROL_ID) == 0)
return BONOBO_OBJECT (cal_prefs_dialog_new ());