aboutsummaryrefslogtreecommitdiffstats
path: root/calendar/gui/gncal-day-panel.c
diff options
context:
space:
mode:
authorFederico Mena Quintero <federico@nuclecu.unam.mx>1999-01-14 09:54:00 +0800
committerArturo Espinosa <unammx@src.gnome.org>1999-01-14 09:54:00 +0800
commitcf406da466a9a74f274a78a3f87eb376082daa62 (patch)
treebd6b7c6479587fad63eccade7f94b41ba02ee005 /calendar/gui/gncal-day-panel.c
parent7f50a3cf209b72145e36459c9658ec1c95889a93 (diff)
downloadgsoc2013-evolution-cf406da466a9a74f274a78a3f87eb376082daa62.tar
gsoc2013-evolution-cf406da466a9a74f274a78a3f87eb376082daa62.tar.gz
gsoc2013-evolution-cf406da466a9a74f274a78a3f87eb376082daa62.tar.bz2
gsoc2013-evolution-cf406da466a9a74f274a78a3f87eb376082daa62.tar.lz
gsoc2013-evolution-cf406da466a9a74f274a78a3f87eb376082daa62.tar.xz
gsoc2013-evolution-cf406da466a9a74f274a78a3f87eb376082daa62.tar.zst
gsoc2013-evolution-cf406da466a9a74f274a78a3f87eb376082daa62.zip
Make the little calendar start up with the correct date.
1999-01-13 Federico Mena Quintero <federico@nuclecu.unam.mx> * gncal-day-panel.c (gncal_day_panel_new): Make the little calendar start up with the correct date. svn path=/trunk/; revision=605
Diffstat (limited to 'calendar/gui/gncal-day-panel.c')
-rw-r--r--calendar/gui/gncal-day-panel.c8
1 files changed, 7 insertions, 1 deletions
diff --git a/calendar/gui/gncal-day-panel.c b/calendar/gui/gncal-day-panel.c
index 422c755371..0c69026278 100644
--- a/calendar/gui/gncal-day-panel.c
+++ b/calendar/gui/gncal-day-panel.c
@@ -92,6 +92,7 @@ gncal_day_panel_new (GnomeCalendar *calendar, time_t start_of_day)
{
GncalDayPanel *dpanel;
GtkWidget *w;
+ struct tm *tm;
g_return_val_if_fail (calendar != NULL, NULL);
@@ -144,11 +145,16 @@ gncal_day_panel_new (GnomeCalendar *calendar, time_t start_of_day)
/* Gtk calendar */
+ tm = localtime (&start_of_day);
+
w = gtk_calendar_new ();
dpanel->gtk_calendar = GTK_CALENDAR (w);
gtk_calendar_display_options (dpanel->gtk_calendar,
GTK_CALENDAR_SHOW_HEADING | GTK_CALENDAR_SHOW_DAY_NAMES);
- dpanel->day_selected_id = gtk_signal_connect (GTK_OBJECT (dpanel->gtk_calendar), "day_selected_double_click",
+ gtk_calendar_select_month (dpanel->gtk_calendar, tm->tm_mon, tm->tm_year + 1900);
+ gtk_calendar_select_day (dpanel->gtk_calendar, tm->tm_mday);
+ dpanel->day_selected_id = gtk_signal_connect (GTK_OBJECT (dpanel->gtk_calendar),
+ "day_selected_double_click",
(GtkSignalFunc) calendar_day_selected,
dpanel);
gtk_signal_connect (GTK_OBJECT (dpanel->gtk_calendar), "month_changed",